02Follow the moneyNorwich

Norwich Township · Money

Follow the money.

Open the allocation. Check the actuals. Follow the decision into delivery.

Money & projects Explore sections
What do these money figures mean?
Budget
Planned costs for a stated year or project.
Annual allocation
Funding assigned for one year. It may be part of a larger project.
Lifetime project budget
The stated budget for the full project across its years.
Forecast
An estimate of the eventual cost, as of the date shown.
Tax requirement (levy)
The amount to raise from property taxes, after other funding.
Contract award
The accepted contract price, with its stated tax and scope.
Recorded costs or payments
Amounts reported for the period shown. They do not establish project completion.

County spending and County taxes explained →

These are Norwich’s finances. County finances are separate. See County projects located here.

Filters1 active
Reset
adoptedoperating

Recreation and culture: six services, every facility and account

Subset of Norwich operating expenditure; do not add to whole-Township total gross operating expenditure · 2026 · CAD · municipal budget basis

Original approved$1,394,700
Revised authorizationNot established
Reported actual$744,561Through 2026-08-31
Published forecastNot established
Budgeted revenue $430,700Net levy / subsidy $964,000

Does the breakdown add up?

Source total $1,394,700Covered on the stated basis $1,394,700Reconciled difference $0

Expense leaf accounts reconcile to the six source groups. Source-reported actual $744,561; facility/account totals can differ by dollar rounding.

Definitions, changes & interpretation
  • Dedicated resident drill-down, using the same accounts as the Township operating schedule. Revenue430,700; levy964,000. Arena fire-code repair variance is operating, separate from capital painting/boilers.
3 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

  3. FS 2026-15 — Financial summary report pages 1–3

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

What is the total made of?

FiltersRefine results
Clear row filters

150 matching accounts. Parent totals include the indented accounts. — means no published amount.

Allocation by service

Norwich · 2026 · gross operating expenditure · original

  1. NCC and arena$618,100
  2. Administration and programs$284,700
  3. Parks$226,300
  4. Pool$155,200
  5. Other halls$91,600
  6. Libraries$18,800
CAD · Largest 6 extracted rows by absolute magnitude on this basis. Signed inflows or recoveries retain their minus sign. The full accessible table and sources are below.
3 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

  3. FS 2026-15 — Financial summary report pages 1–3

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Recreation and culture: six services, every facility and account · 2026 · gross operating expenditure · CAD
Service / facility / accountOriginal budgetActualPrior budgetPrior actualRevenueNet levyEvidence
Administration and programsRecreation and cultural services$284,700$104,482Through 2026-08-31——$0$284,700
Details & source

Source summary group; not additional spending beyond the operating budget.

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Administration & Recreation ProgramsRecreation and cultural services$284,700$104,482Through 2026-08-31————
Details & source

Facility gross expenditure subtotal as published. Individually rounded account actuals can differ from the subtotal by $1–$2; no balancing adjustment applied.

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

SalariesAdministration & Recreation ProgramsRecreation and cultural services$197,800$68,033Through 2026-08-31$279,900$253,412——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.26; interim report p.23

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Payroll BurdenAdministration & Recreation ProgramsRecreation and cultural services$62,400$22,460Through 2026-08-31$93,500$91,366——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.26; interim report p.23

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Office SuppliesAdministration & Recreation ProgramsRecreation and cultural services$3,000$0Through 2026-08-31$3,000$1,986——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.26; interim report p.23

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Telephone & InternetAdministration & Recreation ProgramsRecreation and cultural services$1,000$1,004Through 2026-08-31$1,000$793——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.26; interim report p.23

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

MileageAdministration & Recreation ProgramsRecreation and cultural services$800$0Through 2026-08-31$800$0——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.26; interim report p.23

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

ConferencesAdministration & Recreation ProgramsRecreation and cultural services$1,800$0Through 2026-08-31$0$0——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.26; interim report p.23

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

MembershipsAdministration & Recreation ProgramsRecreation and cultural services$500$0Through 2026-08-31$500$0——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.26; interim report p.23

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

IT MaintenanceAdministration & Recreation ProgramsRecreation and cultural services$8,000$5,972Through 2026-08-31$8,000$7,788——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.26; interim report p.23

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

TrainingAdministration & Recreation ProgramsRecreation and cultural services$500$0Through 2026-08-31$500$0——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.26; interim report p.23

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Community EventsAdministration & Recreation ProgramsRecreation and cultural services$8,500$7,013Through 2026-08-31$4,000$7,129——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.26; interim report p.23

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Miscellaneous ExpenseAdministration & Recreation ProgramsRecreation and cultural services$400$0Through 2026-08-31$400$12——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.26; interim report p.23

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

ParksRecreation and cultural services$226,300$129,593Through 2026-08-31——$10,500$215,800
Details & source

Source summary group; not additional spending beyond the operating budget.

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

ParksRecreation and cultural services$226,300$129,593Through 2026-08-31————
Details & source

Facility gross expenditure subtotal as published. Individually rounded account actuals can differ from the subtotal by $1–$2; no balancing adjustment applied.

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

SalariesParksRecreation and cultural services$72,200$49,591Through 2026-08-31$86,100$64,365——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Payroll BurdenParksRecreation and cultural services$33,100$23,803Through 2026-08-31$30,000$30,895——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Operating Equipment & SuppliesParksRecreation and cultural services$2,000$2,065Through 2026-08-31$2,000$1,199——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Fuel & OilParksRecreation and cultural services$6,500$4,340Through 2026-08-31$8,000$5,768——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

HeatParksRecreation and cultural services$500$284Through 2026-08-31$500$417——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

HydroParksRecreation and cultural services$5,000$2,472Through 2026-08-31$5,000$4,429——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

WaterParksRecreation and cultural services$12,500$6,028Through 2026-08-31$12,500$11,946——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Maintenance & Repairs: BuildingParksRecreation and cultural services$9,000$2,408Through 2026-08-31$9,000$2,462——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Maintenance & Repairs: GroundsParksRecreation and cultural services$50,000$21,292Through 2026-08-31$50,000$42,284——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Maintenance & Repairs: EquipmentParksRecreation and cultural services$5,000$5,095Through 2026-08-31$7,000$967——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Maintenance & Repairs: VehiclesParksRecreation and cultural services$3,000$0Through 2026-08-31$3,000$703——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Contracted Services - Grass CuttingParksRecreation and cultural services$26,500$11,221Through 2026-08-31$26,500$22,442——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Miscellaneous ExpenseParksRecreation and cultural services$1,000$69Through 2026-08-31$1,000$510——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Transfer to ReservesParksRecreation and cultural services$0$925Through 2026-08-31$0$6,660——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

DonationsParksRecreation and cultural services$0$0Through 2026-08-31$0$0——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.27; interim report p.24

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

NCC and arenaRecreation and cultural services$618,100$353,770Through 2026-08-31——$341,100$277,000
Details & source

Source summary group; not additional spending beyond the operating budget.

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Norwich ArenaRecreation and cultural services$511,700$287,218Through 2026-08-31————
Details & source

Facility gross expenditure subtotal as published. Individually rounded account actuals can differ from the subtotal by $1–$2; no balancing adjustment applied.

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

SalariesNorwich ArenaRecreation and cultural services$169,900$81,811Through 2026-08-31$148,000$159,172——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.28; interim report p.25

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Payroll BurdenNorwich ArenaRecreation and cultural services$78,100$39,269Through 2026-08-31$68,100$73,349——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.28; interim report p.25

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Office SuppliesNorwich ArenaRecreation and cultural services$1,000$108Through 2026-08-31$1,000$505——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.28; interim report p.25

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Cleaning & Maintenance SuppliesNorwich ArenaRecreation and cultural services$15,000$9,181Through 2026-08-31$14,000$14,312——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.28; interim report p.25

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Operating Equipment & SuppliesNorwich ArenaRecreation and cultural services$9,000$5,497Through 2026-08-31$9,000$8,793——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.28; interim report p.25

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Fuel & OilNorwich ArenaRecreation and cultural services$5,000$2,348Through 2026-08-31$4,500$4,696——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.28; interim report p.25

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

Clothing AllowanceNorwich ArenaRecreation and cultural services$3,200$4,489Through 2026-08-31$3,200$2,263——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.28; interim report p.25

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

HeatNorwich ArenaRecreation and cultural services$13,000$6,204Through 2026-08-31$12,000$10,458——
Details & source

Published dash interpreted as zero. Prior actual is unaudited budget comparative.

Source location: Approved budget PDF p.28; interim report p.25

2 source records
  1. 2026 Final Operating Budget — Schedule A PDF pages 2–36

    Township of Norwich · Published 2026-03-10 · Event/reporting date 2026-03-10 · 2026; 2025 comparatives

    adopted By-law 16-2026 · Primary record verified · 2025 actual column is budget-book comparative, not an audit opinion.

  2. FS 2026-15 — Operating financial summary pages 1–33

    Township of Norwich · Published 2026-09-22 · Event/reporting date 2026-09-22 · 2026 through August 31

    report presented for information · Primary record verified · Interim amounts, not final-year outcomes.

From an allocation to a result

Norwich · Parks, recreation & culture

Otterville pool replacement: preliminary design and grant application

A grant application and up-to-$60,000 preliminary consulting authority have been approved. Full pool construction is not funded by this authorization.

Norwich

Preliminary consulting authorized; construction and grant award not established
Original budget
$60,000
Next target
No next date listed
Latest update
2026-09-08 · Otterville pool: grant application and preliminary design

Norwich · Roads & bridges

Beaconsfield and Substation road conversion package

Two gravel-road conversions share reconstruction and surface-treatment awards. The Township also plans an 800-metre full-load asphalt section of Substation Road, with the additional full-load cost to be paid by the neighbouring property owner under a future agreement.

Norwich

Two contracts awarded; asphalt agreement and final funding unresolved in reviewed record
Original budget
$1,797,160
Named suppliers
South Brant Excavating Inc.; Walker Construction Limited
Next target
No next date listed
Latest update
2026-08-31 · Spending reported through this date

Norwich · Roads & bridges

Brock Street West reconstruction

Council awarded Brock Street reconstruction to Navacon. The May cost forecast for Norwich’s share was $1.885 million against a $1.620 million original budget.

Norwich

Spending reported · completion unconfirmed
Revised budget
$1,620,000
Named supplier
Navacon Construction Inc.
Next target
No next date listed
Latest update
2026-08-31 · Financial reporting cutoff

Norwich · Other projects

Council Chamber Desks - Budget Ammendment CAO 2026-06

Council Chamber Desks - Budget Ammendment CAO 2026-06

Norwich

Spending reported · completion unconfirmed
Revised budget
$9,750
Next target
No next date listed
Latest update
2026-08-31 · Financial reporting cutoff

Norwich · Fire & public safety

Diesel Exhaust Capture - Station 1, 2 and 4

Diesel Exhaust Capture - Station 1, 2 and 4

Norwich

Spending reported · completion unconfirmed
Revised budget
$100,000
Next target
No next date listed
Latest update
2026-08-31 · Financial reporting cutoff

Norwich · Parks, recreation & culture

NCC - Interior Paint - Arena area

NCC - Interior Paint - Arena area

Norwich

Spending reported · completion unconfirmed
Revised budget
$120,000
Next target
No next date listed
Latest update
2026-08-31 · Financial reporting cutoff