More spending decisions (46)
2026-10-13 · Resolution 17
Resolution 17 carried in adopted minutes
$183,741 · Award plus the Township’s non-refundable portion of HST, not payment or an executed final contract.
Consequence: October 13 adopted minutes record a formal tender waiver and a $183,741 award to Permanent Paving Ltd., plus the Township’s non-refundable portion of HST, for a section of Substation Road asphalt. Council authorized the contractor agreement and an Oxford Cattle Company agreement covering the incremental asphalt cost above double surface treatment. Signed agreements, payments and completion are not established.
4 source records
- October 13 Council recording — full available captions reviewed
- Publisher
- Township of Norwich
- Source date
- 2026-10-13
- Published
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- caption_reviewed
- Decision / approval status
- Caption-indicated; written minutes pending
- Evidence type
- automatic_captions
- Evidence qualification
- moderate
- Passage / page
- 1,356 displayed cues, 13:03–3:12:57; runtime 3:13:21
- Evidence note
- Full available October 13 captions reviewed October 29; audio and visual voting were not independently verified. Written October 13 minutes were not available in this audit.
- Evidence notes
- Full available October 13 captions reviewed October 29; audio and visual voting were not independently verified. Written October 13 minutes were not available in this audit.
- Caption passages
- 1356
- Audio independently verified
- false
- Visual vote verified
- false
- October 13, 2026 Council agenda packet
- Publisher
- Township of Norwich
- Source date
- 2026-10-13
- Published
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- agenda
- Passage / page
- 375-page packet; specified reports only
- Evidence note
- Agenda recommendations are not adopted decisions. Targeted reports inspected; the full packet was not read line by line.
- Evidence notes
- Agenda recommendations are not adopted decisions. Targeted reports inspected; the full packet was not read line by line.
- Substation Road asphalt contract awarded
- Source date
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-30
- Retrieved
- 2026-10-30
- Evidence status
- verified_primary
- Decision / approval status
- contract award; completion not verified
- Passage / page
- Resolution 17
- Evidence note
- Primary-source body reviewed in the October 30 audit Draft minutes pending adoption; award is not evidence of completed paving. No new completion date verified.
- Adopted October 13 minutes: Substation asphalt award
- Source date
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-11-07
- Evidence status
- verified_primary
- Passage / page
- Page 10, resolution 17; page 15 adoption certification
- Evidence note
- Records tender waiver, Permanent Paving award and authority to execute contractor and Oxford Cattle cost-sharing agreements. Authority is not proof of signed agreements, payment or completed work. No named abstention or individual vote count is recorded.
2026-10-13 · By-law 50-2026
Caption-indicated passage; enacted text and fine approval not verified
Consequence: The report proposes construction-noise exemption hours of 7 a.m.–7 p.m. and firearms/power-equipment hours of 7 a.m.–9 p.m. Captions indicate a favourable vote; exact enacted exemptions and Court approval require confirmation before treating these details as current law.
2 source records
- October 13 Council recording — full available captions reviewed
- Publisher
- Township of Norwich
- Source date
- 2026-10-13
- Published
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- caption_reviewed
- Decision / approval status
- Caption-indicated; written minutes pending
- Evidence type
- automatic_captions
- Evidence qualification
- moderate
- Passage / page
- 1,356 displayed cues, 13:03–3:12:57; runtime 3:13:21
- Evidence note
- Full available October 13 captions reviewed October 29; audio and visual voting were not independently verified. Written October 13 minutes were not available in this audit.
- Evidence notes
- Full available October 13 captions reviewed October 29; audio and visual voting were not independently verified. Written October 13 minutes were not available in this audit.
- Caption passages
- 1356
- Audio independently verified
- false
- Visual vote verified
- false
- October 13, 2026 Council agenda packet
- Publisher
- Township of Norwich
- Source date
- 2026-10-13
- Published
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- agenda
- Passage / page
- 375-page packet; specified reports only
- Evidence note
- Agenda recommendations are not adopted decisions. Targeted reports inspected; the full packet was not read line by line.
- Evidence notes
- Agenda recommendations are not adopted decisions. Targeted reports inspected; the full packet was not read line by line.
2026-10-13 · Resolution 5 / CP2026-314
Deferred — draft minutes pending adoption
Consequence: Council deferred the 14-townhouse proposal at 85–87 Main Street West and 6 Averys Lane for further grading, elevation, stormwater and flooding review, with additional peer review as needed.
3 source records
- October 13, 2026 Council agenda packet
- Publisher
- Township of Norwich
- Source date
- 2026-10-13
- Published
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- agenda
- Passage / page
- 375-page packet; specified reports only
- Evidence note
- Agenda recommendations are not adopted decisions. Targeted reports inspected; the full packet was not read line by line.
- Evidence notes
- Agenda recommendations are not adopted decisions. Targeted reports inspected; the full packet was not read line by line.
- October 13 Council recording — full available captions reviewed
- Publisher
- Township of Norwich
- Source date
- 2026-10-13
- Published
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- caption_reviewed
- Decision / approval status
- Caption-indicated; written minutes pending
- Evidence type
- automatic_captions
- Evidence qualification
- moderate
- Passage / page
- 1,356 displayed cues, 13:03–3:12:57; runtime 3:13:21
- Evidence note
- Full available October 13 captions reviewed October 29; audio and visual voting were not independently verified. Written October 13 minutes were not available in this audit.
- Evidence notes
- Full available October 13 captions reviewed October 29; audio and visual voting were not independently verified. Written October 13 minutes were not available in this audit.
- Caption passages
- 1356
- Audio independently verified
- false
- Visual vote verified
- false
- Main Street/Averys Lane townhouse proposal remains deferred
- Source date
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-30
- Retrieved
- 2026-10-30
- Evidence status
- verified_primary
- Decision / approval status
- deferred
- Passage / page
- Resolution 5, CP2026-314
- Evidence note
- Primary-source body reviewed in the October 30 audit Outcome recorded in draft minutes pending November 3 adoption.
2026-10-13 · Resolutions 23–25; resolution 24 lost, resolution 25 carried
motion lost; report received for information
Consequence: Draft minutes record defeat of the proposed recreation-grant application and single-source preliminary pool design allocation of up to $60,000. Council then received the report for information.
Open the source record
- Pool design-and-grant motion was defeated; whole project not cancelled
- Source date
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-30
- Retrieved
- 2026-10-30
- Evidence status
- verified_primary
- Decision / approval status
- motion lost; report received for information
- Passage / page
- Resolutions 23–25; resolution 24 lost, resolution 25 carried
- Evidence note
- Primary-source body reviewed in the October 30 audit Draft pending November 3 adoption. Does not establish cancellation of the whole pool project; no individual recorded vote count stated.
2026-10-13 · Resolution 17
contract award; completion not verified
Consequence: Draft minutes record a formal tender waiver and award to Permanent Paving Ltd. for $183,741 plus non-refundable HST. Oxford Cattle Company is to cover the incremental cost above double surface treatment.
Open the source record
- Substation Road asphalt contract awarded
- Source date
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-30
- Retrieved
- 2026-10-30
- Evidence status
- verified_primary
- Decision / approval status
- contract award; completion not verified
- Passage / page
- Resolution 17
- Evidence note
- Primary-source body reviewed in the October 30 audit Draft minutes pending adoption; award is not evidence of completed paving. No new completion date verified.
2026-10-13 · Resolution 5, CP2026-314
deferred
Consequence: Council deferred the 14-townhouse proposal at 85–87 Main Street West and 6 Averys Lane for further grading, elevation, stormwater and flooding review, with additional peer review as needed.
Open the source record
- Main Street/Averys Lane townhouse proposal remains deferred
- Source date
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-30
- Retrieved
- 2026-10-30
- Evidence status
- verified_primary
- Decision / approval status
- deferred
- Passage / page
- Resolution 5, CP2026-314
- Evidence note
- Primary-source body reviewed in the October 30 audit Outcome recorded in draft minutes pending November 3 adoption.
2026-10-13 · Resolution 6
accepted according to draft minutes
Consequence: Council accepted the 2025 audited financial statements. This is distinct from the 2026 in-year monitoring report scheduled for November 3.
Open the source record
- 2025 audited financial statements accepted
- Source date
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-30
- Retrieved
- 2026-10-30
- Evidence status
- verified_primary
- Decision / approval status
- accepted according to draft minutes
- Passage / page
- Resolution 6
- Evidence note
- Primary-source body reviewed in the October 30 audit Draft minutes pending adoption; no revised 2025 values introduced.
2026-10-13 · Resolution 12 and resolution 27
passed according to draft minutes
Consequence: October 13 draft minutes record passage of noise by-law 50-2026.
Open the source record
- Noise by-law 50-2026 passed
- Source date
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-30
- Retrieved
- 2026-10-30
- Evidence status
- verified_primary
- Decision / approval status
- passed according to draft minutes
- Passage / page
- Resolution 12 and resolution 27
- Evidence note
- Primary-source body reviewed in the October 30 audit The enacted by-law text was not reread in this refresh; detailed rules are not newly verified.
2026-09-22 · Resolution 5 / ZN 3-26-09
Deferred
Consequence: Application at 793424 Slant Road deferred pending Clean Water Act section 59 clearance.
Open the source record
- Council minutes — 2026-09-22
- Publisher
- Township of Norwich
- Source date
- 2026-09-22
- Published
- 2026-09-22
- Event / reporting date
- 2026-09-22
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-09-22 · Resolutions 11 and 20 / By-law 47-2026
Carried; by-law enacted
Consequence: Dormant Permits Policy adopted; exact enacted implementation text requires checking before describing rights, notice requirements or deadlines.
Open the source record
- Council minutes — 2026-09-22
- Publisher
- Township of Norwich
- Source date
- 2026-09-22
- Published
- 2026-09-22
- Event / reporting date
- 2026-09-22
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-09-22 · Resolution 16
Carried
Consequence: Support for an Execulink CRTC Broadband Fund application. This is not a grant award, funding confirmation or completed fibre expansion.
Open the source record
- Council minutes — 2026-09-22
- Publisher
- Township of Norwich
- Source date
- 2026-09-22
- Published
- 2026-09-22
- Event / reporting date
- 2026-09-22
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-09-08 · Resolution23
Carried
$60,000 · Historical September 8 maximum consulting authority; the grant/design motion was defeated on October 13. This is not a current allocation or actual spending.
Consequence: The September 8 carried decision remains historical. October 13 adopted minutes record reconsideration of the September 8 motion, defeat of the grant application and preliminary-design authority of up to $60,000, and receipt of CAO2026-29 for information. This does not establish cancellation of the whole pool-replacement project.
4 source records
- Council minutes 09/08
- Publisher
- Township of Norwich
- Published
- 2026-09-08
- Event / reporting date
- 2026-09-08
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- relevant resolution noted in connected record
- CAO 2026-29 — Otterville pool grant application
- Publisher
- Township of Norwich
- Published
- 2026-09-08
- Event / reporting date
- 2026-09-08
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- published staff report
- Passage / page
- full report
- Evidence notes
- Downloaded and extracted underlying primary PDF.
- Pool design-and-grant motion was defeated; whole project not cancelled
- Source date
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-10-30
- Retrieved
- 2026-10-30
- Evidence status
- verified_primary
- Decision / approval status
- motion lost; report received for information
- Passage / page
- Resolutions 23–25; resolution 24 lost, resolution 25 carried
- Evidence note
- Primary-source body reviewed in the October 30 audit Draft pending November 3 adoption. Does not establish cancellation of the whole pool project; no individual recorded vote count stated.
- Adopted October 13 minutes: pool grant and design motion
- Source date
- 2026-10-13
- Event / reporting date
- 2026-10-13
- Reviewed
- 2026-11-07
- Evidence status
- verified_primary
- Passage / page
- Pages 13-14, resolutions 23-25; page 15 adoption certification
- Evidence note
- Resolution 23 carried reconsideration, resolution 24 lost the grant/preliminary-design motion and resolution 25 received CAO2026-29 for information. This is not cancellation of the whole pool project. No individual voting positions or vote count are recorded.
2026-09-08 · Resolution15
Carried
$97,739 · tendered construction award amount
Consequence: Drainage assessments and overall engineering cost are distinct from the Township tax-funded share.
Open the source record
- Council minutes 09/08
- Publisher
- Township of Norwich
- Published
- 2026-09-08
- Event / reporting date
- 2026-09-08
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- relevant resolution noted in connected record
2026-09-08 · Resolution 16
Carried
Consequence: Qualified engineer safety review and report back authorized; no reconstruction approval or completed remedy established.
Open the source record
- Council minutes — 2026-09-08
- Publisher
- Township of Norwich
- Source date
- 2026-09-08
- Published
- 2026-09-08
- Event / reporting date
- 2026-09-08
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-09-08 · Resolution 24
Carried; in principle
Consequence: Section 27 payment plan for Jade Horinga at 21 Stover Street North, with CAO negotiation and Mayor/Clerk execution. This is not a charge waiver or general payment-plan policy.
Open the source record
- Council minutes — 2026-09-08
- Publisher
- Township of Norwich
- Source date
- 2026-09-08
- Published
- 2026-09-08
- Event / reporting date
- 2026-09-08
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-09-08 · Resolution 26
Carried
Consequence: Requests for County data-centre proposals/disclosure and staff planning-controls work. This does not approve a project or enact a data-centre ban.
Open the source record
- Council minutes — 2026-09-08
- Publisher
- Township of Norwich
- Source date
- 2026-09-08
- Published
- 2026-09-08
- Event / reporting date
- 2026-09-08
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-09-08 · Resolution 29 / By-law 45-2026
Carried; by-law enacted
Consequence: Remuneration bylaw passed following August 11 direction. Exact rates were not extracted in this audit.
Open the source record
- Council minutes — 2026-09-08
- Publisher
- Township of Norwich
- Source date
- 2026-09-08
- Published
- 2026-09-08
- Event / reporting date
- 2026-09-08
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-08-11 · Resolution19
Carried
$499,211.25 · unaudited operating surplus directed to Road Construction Reserve
Consequence: Reserve transfers also cover service surpluses/deficits and asset sales; headline surplus is not every transfer.
2 source records
- Council minutes August 11, 2026
- Publisher
- Township of Norwich
- Published
- 2026-08-11
- Event / reporting date
- 2026-08-11
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- pp.12–15 resolutions 18, 19, 24; p.17 by-laws
- Evidence notes
- Downloaded and extracted underlying primary PDF.
- FS 2026-13 — 2025 yearend reserves and transfers
- Publisher
- Township of Norwich
- Published
- 2026-08-11
- Event / reporting date
- 2026-08-11
- Reporting period
- 2025 yearend
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- transfers approved August11; report says final closing entries remain
- Passage / page
- pp.1–5
- Evidence notes
- Downloaded and extracted underlying primary PDF.
2026-08-11 · Resolution24
Carried
$65,000 · upset reserve transfer authorization
Consequence: Developer pays subdivision stormwater pipe, outlet and separator; Township pays additional catchbasins, ditch/culvert removal and contribution to engineering.
2 source records
- Council minutes August 11, 2026
- Publisher
- Township of Norwich
- Published
- 2026-08-11
- Event / reporting date
- 2026-08-11
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- pp.12–15 resolutions 18, 19, 24; p.17 by-laws
- Evidence notes
- Downloaded and extracted underlying primary PDF.
- CAO 2026-23 — Burgess Street stormwater cost share
- Publisher
- Township of Norwich
- Published
- 2026-08-11
- Event / reporting date
- 2026-08-11
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- published staff report
- Passage / page
- pp.1,3–4
- Evidence notes
- Downloaded and extracted underlying primary PDF.
2026-08-11 · Resolution18
Carried
$202,143.20 · tendered construction award amount
Consequence: Drainage assessments and overall engineering cost are distinct from the Township tax-funded share.
2 source records
- Council minutes August 11, 2026
- Publisher
- Township of Norwich
- Published
- 2026-08-11
- Event / reporting date
- 2026-08-11
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- pp.12–15 resolutions 18, 19, 24; p.17 by-laws
- Evidence notes
- Downloaded and extracted underlying primary PDF.
- DR 2026-21 — Frain Drain tender results
- Publisher
- Township of Norwich
- Published
- 2026-08-11
- Event / reporting date
- 2026-08-11
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- published staff report
- Passage / page
- pp.1–3
- Evidence notes
- Downloaded and extracted underlying primary PDF.
2026-08-11 · Resolution 21
Carried
$50 · Facility-use charge per day; not a patient treatment price.
Consequence: Ongoing Medical Centre facility use with an agreement.
Open the source record
- August 11 Council minutes — foot-care facility use
- Publisher
- Township of Norwich
- Source date
- 2026-08-11
- Published
- 2026-08-11
- Event / reporting date
- 2026-08-11
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted
- Passage / page
- Resolution 21, page 13
- Evidence note
- The $50/day is a facility-use charge, not a patient treatment fee.
- Evidence notes
- The $50/day is a facility-use charge, not a patient treatment fee.
2026-08-11 · Resolution 23 / By-law 41-2026
Carried; by-law enacted
Consequence: Township assumed Phase 1 services/highways. This is distinct from the original subdivision or zoning approval.
Open the source record
- Council minutes — 2026-08-11
- Publisher
- Township of Norwich
- Source date
- 2026-08-11
- Published
- 2026-08-11
- Event / reporting date
- 2026-08-11
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-07-14 · Resolution21
Carried
$1,837,191 · sum of the two approved award amounts; excludes estimated asphalt component
Consequence: Original estimate $1,797,160; staff forecast $1,922,046. Funding table leaves $197,710 to yearend recommendation.
2 source records
- Council minutes July 14, 2026
- Publisher
- Township of Norwich
- Published
- 2026-07-14
- Event / reporting date
- 2026-07-14
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- pp.10–11 resolution 21
- Evidence notes
- Downloaded and extracted underlying primary PDF.
- OP 2026-25 — Beaconsfield and Substation tender awards
- Publisher
- Township of Norwich
- Published
- 2026-07-14
- Event / reporting date
- 2026-07-14
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- published staff report
- Passage / page
- pp.1–5
- Evidence notes
- Downloaded and extracted underlying primary PDF.
2026-07-14 · Resolution 17
Carried
Consequence: Council approved plan/program-committee changes and appointed Lindsay Picknell as alternate CEMC.
Open the source record
- Council minutes July 14, 2026
- Publisher
- Township of Norwich
- Published
- 2026-07-14
- Event / reporting date
- 2026-07-14
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- pp.10–11 resolution 21
- Evidence notes
- Downloaded and extracted underlying primary PDF.
2026-07-14 · Resolution 23
Carried
Consequence: Three traffic monitors; two new speed-feedback signs at Hawtrey; relocation of two existing signs to Pitcher/Carmen during Stover work; two to three delineator sets at Middletown/Burgessville.
Open the source record
- Council minutes — 2026-07-14
- Publisher
- Township of Norwich
- Source date
- 2026-07-14
- Published
- 2026-07-14
- Event / reporting date
- 2026-07-14
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-06-30 · Resolution 9
Carried
Consequence: Agreement extended through December 31, 2026.
Open the source record
- June 30 Council minutes
- Publisher
- Township of Norwich
- Source date
- 2026-06-30
- Published
- 2026-06-30
- Event / reporting date
- 2026-06-30
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Page 5, Resolution 9 and mayoral report
- Evidence note
- Medical agreement extension and reported final payment on the specific 2006 Community Centre debenture; not a claim that the Township is debt-free.
- Evidence notes
- Medical agreement extension and reported final payment on the specific 2006 Community Centre debenture; not a claim that the Township is debt-free.
2026-06-16 · Resolution16
Carried
$172,221.50 · tendered construction award amount
Consequence: Drainage assessments and overall engineering cost are distinct from the Township tax-funded share.
Open the source record
- Council minutes 06/16
- Publisher
- Township of Norwich
- Published
- 2026-06-16
- Event / reporting date
- 2026-06-16
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- relevant resolution noted in connected record
2026-06-16 · Resolution 21 / By-law 31-2026
Carried; by-law enacted
Consequence: July 1 non-residential Township charge is $23.59 per m². County charges are additional.
3 source records
- June 16 Council minutes — development-charge reduction
- Publisher
- Township of Norwich
- Source date
- 2026-06-16
- Published
- 2026-06-16
- Event / reporting date
- 2026-06-16
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted
- Passage / page
- Resolution 21, pages 11–12
- Evidence note
- By-law 31-2026 enacts a 35% reduction in non-residential Township development charges.
- Evidence notes
- By-law 31-2026 enacts a 35% reduction in non-residential Township development charges.
- Township development charges effective July 1, 2026
- Publisher
- Township of Norwich
- Source date
- 2026-07-01
- Published
- 2026-07-01
- Event / reporting date
- 2026-07-01
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- published effective rates
- Passage / page
- Published rate table
- Evidence note
- The published non-residential rate already includes the Township reduction. County charges are additional.
- Evidence notes
- The published non-residential rate already includes the Township reduction. County charges are additional.
- Consolidated development-charge by-law — July 2026
- Publisher
- Township of Norwich
- Source date
- 2026-07
- Published
- 2026-07
- Event / reporting date
- 2026-07
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Passage / page
- Section 2b(iii), factor 0.65
- Evidence note
- Do not apply the 35% reduction a second time to the July rate.
- Evidence notes
- Do not apply the 35% reduction a second time to the July rate.
2026-06-16 · Resolution 6 / By-law 09-2026-Z
Carried; by-law enacted
Consequence: CP 2026-190 zoning amendment approved. Read the enacted bylaw for exact standards.
Open the source record
- Council minutes — 2026-06-16
- Publisher
- Township of Norwich
- Source date
- 2026-06-16
- Published
- 2026-06-16
- Event / reporting date
- 2026-06-16
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-05-26 · Resolution9; OP 2026-19; PW-2026-02
Carried
Consequence: May 26 Resolution 9 awarded PW-2026-02 Brock Street reconstruction to Navacon and allowed use of development-charge funds. The supplied minutes extract does not establish an award amount or completion.
2 source records
- Council minutes — 2026-05-26
- Publisher
- Township of Norwich
- Published
- 2026-05-26
- Event / reporting date
- 2026-05-26
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Selected resolutions; exact page in each decision
- Evidence notes
- Downloaded official PDF. Scanned document OCR performed; cited financial table and recorded vote pages visually checked where applicable.
- OP 2026-19 — Brock Street reconstruction tender and financing
- Publisher
- Township of Norwich
- Published
- 2026-05-26
- Event / reporting date
- 2026-05-26
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- staff report supporting adopted resolution9
- Passage / page
- pp.2–4; bid table p2 and Township costs/funding table p3
- Evidence notes
- Full primary PDF downloaded and text extracted. Financial table p3 visually checked. Whole tender includes Township, County and private-development shares; Township-share estimates are net of HST rebate. Report contains Navicon spelling in prose; recommendation, bid table and adopted minutes name Navacon.
2026-05-26 · Resolution 12
Carried
Consequence: Staff were directed to bring an amending by-law. This resolution is direction to prepare the change, not evidence of the by-law’s later enactment.
Open the source record
- Council minutes — 2026-05-26
- Publisher
- Township of Norwich
- Published
- 2026-05-26
- Event / reporting date
- 2026-05-26
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Selected resolutions; exact page in each decision
- Evidence notes
- Downloaded official PDF. Scanned document OCR performed; cited financial table and recorded vote pages visually checked where applicable.
2026-05-26 · Resolution 13
Lost
$20,000 · Defeated proposal: up to $20,000 newsletter funding, not approved expenditure
Consequence: May 26 Resolution 13 proposed a Communications Plan, an 18-month Communications Coordinator/Executive Assistant contract and up to $20,000 newsletter funding. The motion was lost 3–2; these items were not approved by this motion.
Open the source record
- Council minutes — 2026-05-26
- Publisher
- Township of Norwich
- Published
- 2026-05-26
- Event / reporting date
- 2026-05-26
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Selected resolutions; exact page in each decision
- Evidence notes
- Downloaded official PDF. Scanned document OCR performed; cited financial table and recorded vote pages visually checked where applicable.
2026-05-12 · Resolution 27
Carried
$400,000 · Maximum Township development-charge exemption, not a cash grant, payment or County waiver.
Consequence: Township development-charge exemption for 345708 Quaker Street under O. Reg. 20/25; County charges and later building permissions remain separate.
Open the source record
- Council minutes — 2026-05-12
- Publisher
- Township of Norwich
- Source date
- 2026-05-12
- Published
- 2026-05-12
- Event / reporting date
- 2026-05-12
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-05-12 · Resolution 26
Carried 4–1
Consequence: No action taken then on the 2026–2030 plan; staff to report in early 2027 for the new council. This motion did not adopt the plan.
Open the source record
- Council minutes — 2026-05-12
- Publisher
- Township of Norwich
- Source date
- 2026-05-12
- Published
- 2026-05-12
- Event / reporting date
- 2026-05-12
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-04-14 · Resolution17
Carried
$37,403.98 · tendered construction award amount
Consequence: Drainage assessments and overall engineering cost are distinct from the Township tax-funded share.
Open the source record
- Council minutes 04/14
- Publisher
- Township of Norwich
- Published
- 2026-04-14
- Event / reporting date
- 2026-04-14
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- relevant resolution noted in connected record
2026-04-14 · Resolution 13
Carried
Consequence: Prepare RFP, terms of reference and budget for the secondary planning study. Discussion estimated $300,000 over two years with a 50/50 County share; this was not a consultant award or final cost.
Open the source record
- Council minutes — 2026-04-14
- Publisher
- Township of Norwich
- Source date
- 2026-04-14
- Published
- 2026-04-14
- Event / reporting date
- 2026-04-14
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-03-24 · Resolution 6
Carried
Consequence: Authorized 2026 Beaconsfield and Substation gravel conversions. Zenda Line, Quaker to Evergreen, was directed into the draft 2027 budget, not approved for construction.
Open the source record
- Council minutes — 2026-03-24
- Publisher
- Township of Norwich
- Source date
- 2026-03-24
- Published
- 2026-03-24
- Event / reporting date
- 2026-03-24
- Reviewed
- 2026-10-29
- Retrieved
- 2026-10-29
- Verified
- 2026-10-29
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Claim-specific resolution/page locators retained below
- Evidence note
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
- Evidence notes
- Written decision evidence reviewed in the October 29 primary-source audit; no construction completion or actual payment inferred.
2026-03-10 · Resolution25; By-law16-2026
Carried
$12,438,600 · gross annual operating budget
2 source records
- Council minutes 03/10
- Publisher
- Township of Norwich
- Published
- 2026-03-10
- Event / reporting date
- 2026-03-10
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- relevant resolution noted in connected record
- Evidence notes
- Official URL filename says March 24; document title/index identify March 10.
- 2026 Final Operating Budget — Schedule A
- Publisher
- Township of Norwich
- Published
- 2026-03-10
- Event / reporting date
- 2026-03-10
- Reporting period
- 2026; 2025 comparatives
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted By-law 16-2026
- Passage / page
- PDF pages 2–36
- Evidence notes
- 2025 actual column is budget-book comparative, not an audit opinion.
2026-02-26 · Resolution8
Carried
$50,000 · Operating project authorization from Contingency Reserve; not payment.
Consequence: Approved for the 2026 operating budget following traffic-safety open houses.
Open the source record
- Budget - Operating minutes — 2026-02-26
- Publisher
- Township of Norwich
- Published
- 2026-02-26
- Event / reporting date
- 2026-02-26
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Selected resolutions; exact page in each decision
- Evidence notes
- Downloaded official PDF. Scanned document OCR performed; cited financial table and recorded vote pages visually checked where applicable. PDF has7 pages, with printed page numbers skipping4 and a rotated/scanned page; traffic-calming resolution8 is PDFp6/printedp7. Do not infer missing text.
2026-02-26 · Resolution3
Carried
$38,900 · 2026 operating budget enhancement; not actual spending.
Consequence: Staff-benefit enhancement added to the 2026 operating budget.
Open the source record
- Budget - Operating minutes — 2026-02-26
- Publisher
- Township of Norwich
- Published
- 2026-02-26
- Event / reporting date
- 2026-02-26
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Selected resolutions; exact page in each decision
- Evidence notes
- Downloaded official PDF. Scanned document OCR performed; cited financial table and recorded vote pages visually checked where applicable. PDF has7 pages, with printed page numbers skipping4 and a rotated/scanned page; traffic-calming resolution8 is PDFp6/printedp7. Do not infer missing text.
2026-02-26 · Resolution4
Carried
$16,000 · 2026 operating budget enhancement; not actual spending.
Consequence: Summer-student funding added to the 2026 operating budget.
Open the source record
- Budget - Operating minutes — 2026-02-26
- Publisher
- Township of Norwich
- Published
- 2026-02-26
- Event / reporting date
- 2026-02-26
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Selected resolutions; exact page in each decision
- Evidence notes
- Downloaded official PDF. Scanned document OCR performed; cited financial table and recorded vote pages visually checked where applicable. PDF has7 pages, with printed page numbers skipping4 and a rotated/scanned page; traffic-calming resolution8 is PDFp6/printedp7. Do not infer missing text.
2026-02-26 · Special meeting Resolution2; BB 2026-05
Carried
Consequence: February 26 special meeting Resolution 2 authorized a conditional permit for foundation, frame and building envelope of a 10,759.54 m², three-storey industrial building at 345708 Quaker Street. This is not occupancy approval or evidence that construction is complete.
Open the source record
- Special Meeting minutes — 2026-02-26
- Publisher
- Township of Norwich
- Published
- 2026-02-26
- Event / reporting date
- 2026-02-26
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Selected resolutions; exact page in each decision
- Evidence notes
- Downloaded official PDF. Scanned document OCR performed; cited financial table and recorded vote pages visually checked where applicable.
2026-02-24 · Resolution9; CAO 2026-11
Carried
Consequence: Requested replacement of “priority groups” with “groups of particular concern” in the joint 2026–2030 plan. This records the February request, not later adoption of a local plan.
Open the source record
- Council minutes — 2026-02-24
- Publisher
- Township of Norwich
- Published
- 2026-02-24
- Event / reporting date
- 2026-02-24
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- Selected resolutions; exact page in each decision
- Evidence notes
- Downloaded official PDF. Scanned document OCR performed; cited financial table and recorded vote pages visually checked where applicable.
2026-02-10 · Resolution21
Carried
$9,750 · authorization before non-refundable HST
Consequence: August budget line is $9,750 and actual $9,921.60; authorization also allows non-refundable HST, so apparent $171.60 variance cannot be labelled unauthorized overrun.
Open the source record
- Council minutes 02/10
- Publisher
- Township of Norwich
- Published
- 2026-02-10
- Event / reporting date
- 2026-02-10
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- relevant resolution noted in connected record
2026-02-10 · Resolution12
Carried
$130,275 · tendered construction award amount
Consequence: Drainage assessments and overall engineering cost are distinct from the Township tax-funded share.
Open the source record
- Council minutes 02/10
- Publisher
- Township of Norwich
- Published
- 2026-02-10
- Event / reporting date
- 2026-02-10
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- relevant resolution noted in connected record
2026-01-13 · Resolution25; By-law02-2026
Carried
$4,806,500 · new annual project allocations
Consequence: Separate capital levy funds reserves and debt service. PA system, doors and boilers require supplemental reports before starting.
2 source records
- Council minutes 01/13
- Publisher
- Township of Norwich
- Published
- 2026-01-13
- Event / reporting date
- 2026-01-13
- Reporting period
- 2026
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted minutes
- Passage / page
- relevant resolution noted in connected record
- 2026 Ten Year Capital Budget and Forecast — Schedule A to By-law 02-2026
- Publisher
- Township of Norwich
- Published
- 2026-01-13
- Event / reporting date
- 2026-01-13
- Reporting period
- 2026; forecast 2027–2035
- Retrieved
- 2026-10-01
- Verified
- 2026-10-01
- Evidence status
- verified_primary
- Decision / approval status
- adopted By-law 02-2026
- Passage / page
- PDF pages 2–26 (printed pages 1–25)
- Evidence notes
- Some internal headings say Proposed; adoption confirmed in January 13 minutes. 2027–2035 are forecasts, not current-year authorizations.